1.3 KiB
Fahrplan
Phase 1 ✅
SceneGraph, Skia rendering, shapes, selection, zoom/pan, undo/redo, snap guides.
Core-Engine ✅
Vue 3 + Reka UI panels, properties, layers, toolbar, Yoga auto-layout, inline text editing, canvas rulers.
Phase 2 ✅
.fig import/export, Kiwi codec, clipboard, pen tool, vector networks, groups, Tauri v2 desktop, sections, multi-page, hover highlight, Tier 1 rendering.
Editor-UI + Layout ✅
Components, instances, overrides, component sets, variables (COLOR/FLOAT/STRING/BOOLEAN), collections, modes, image export, context menu, rich text formatting.
Phase 3 🟡
@open-pencil/core, CLI (12 commands), MCP server (29+ tools), AI chat (OpenRouter), JSX renderer, code panel.
Planned: port remaining figma-use tools, attached mode, design guidelines, screenshot verification loop.
Datei-I/O + Visuelle Features 🔲
Prototyping, comments, PWA, Linux Tauri builds, performance optimization, full Figma compatibility test suite.
Phase 4
| Phase | Komponenten + Variablen | Phase 5: KI-Integration & Werkzeuge:Phase 6: Feinschliff + Verteilung:Zeitplan:Geschätzte Dauer:Status |
|---|---|---|
| Phase 1 | 3 months | ✅ |
| Core-Engine | 3 months | ✅ |
| Phase 2 | 2 months | ✅ |
| Editor-UI + Layout | 2 months | ✅ |
| Phase 3 | 2 months | 🟡 |
| Datei-I/O + Visuelle Features | 2 months | 🔲 |