openpencil/.githooks
Fini 6ed9548c0d merge: land the align-branch work onto the refreshed base
47 commits from the align branch merged onto the force-updated remote
base (which had replayed an earlier snapshot of the same work plus new
overlay/pointer features and CI fixes). Conflict resolution: kept the
newer align side for the generation pipeline (orchestrator, mcp, skills,
design tools), kept the base side for the chat-panel test semantics and
graceful overlay teardown, fused both in sub_agent_session (design-turn
thinking policy + graceful epoch finish), and dropped the files each
side had deleted (legacy concurrent/dashboard paths, retired TS skills).
Deduped two identical replayed hunks (export.rs, chat_session_tests.rs).

Known issue carried over: provider_probe_host::landed_connected_outcome_
without_models_is_failure fails on a host with a live provider config
(env-sensitive test, both sides byte-identical there; green on CI).
2026-07-03 00:08:17 +08:00
..
pre-commit chore: enforce rust pre-commit checks 2026-05-24 17:44:42 +08:00